These are the 84-metre Toto Bridge and the rehabilitated 110-metre Unung Bridge, which were constructed by Vision Engineering, and should connect communities between the 2 LLGs of West Pomio Mamusi and Central Inland Pomio.
The completed Toto Bridge was constructed at a cost of K6.4 million while the rehabilitation works on the 30-year-old Unung Bridge cost around K2.9 million.
Pomio MP, Elias Kapavore, says the Unung bridge would be completed by the end of this month.