Total E&P PNG Limited

Water purification tablets donated to Gulf

Continuous heavy rain has caused severe flooding across the Province, disrupting the lives and the population in the coastal and delta areas.

When made aware of the plight suffered by villages in their project area, Total wanted to make a contribution to assist families at this time, said Mr. Jean-Marc Noiray, Managing Director Total E&P PNG Limited.

“As good neighbors, we help each other in times of need. We are pleased to make this contribution, which will help the communities access clean safe drinking water,’’ Mr. Noiray said.

Total begins drilling at Antelope 6

According to a statement released by the Port Moresby Stock Exchange, the well is designed to provide structural control and reservoir definition on the field’s eastern flank.

It has a proposed total depth of about 2,464 metres (8,084 feet) true vertical depth sub-sea and is located about 2km east-south-east of Antelope-3.

InterOil holds a 36.5375% interest in the well.

Total E&P PNG Limited has a 40.1275% interest, Oil Search has 22.8350%, and the remaining 0.5000% is held by minority parties.