Juffa Stops Work

Major flaws in project results in stop work in Oro

He told Loop PNG via email that he has demanded the Building Board to conduct a thorough inspection to the project and to ensure all requirements were complied with in the use of materials and scope.

"We are custodians of public funds. Ultimately the buck stops with me. In this instance I am not satisfied that the contractor has met our requirements.

“The work is of a substandard degree and the materials used are low quality and poor. The company was selected through the PSTB process and awarded the job but they appear to have ignored quality control.