K92 Kora Deposit

K92 announces drilling to Kora Deposit

In a media statement, K92 announced that the first hole from the Kora Drive is being developed from the Irumafimpa Mine towards the Kora Deposit.

The 5m x 5m drive is designed to provide access to the Kora deposit, where K92 is targeting the commencement of production in the first half 2018.

The drilling will also provide the Company with the ability to drill test between Irumafimpa and Kora from underground drill cuddies.